Final - Bobwhite-Manatee Transmission Line
In this final lab we used multiple skills learned throughout the course to analyze the proposed route for a transmission line from Manatee County to Sarasota County. The four main criteria that needed to be analyzed were environmentally sensitive lands, homes, schools, and the length of the transmission line. Although learning the technical aspects of ArcGIS was challenging for me, but I enjoyed the challenge and see everything come together in a final product.
Comments
Post a Comment